Quality Standards

HEMI Systems builds every industrial project on quality standards you can audit. Disciplined processes, rigorous inspections, and documented controls guide the work from start to finish.

Our crews hold mandatory certifications and complete ongoing competency checks. From millwright installations to process piping and steel fabrication, we use proven materials and calibrated equipment. We measure, monitor, and report at every critical step so outcomes meet spec, schedule, and budget.

Accountability runs from leadership to the job site. Clear acceptance criteria, root-cause analysis, and corrective action stop issues from recurring. HEMI Systems quality connects directly to integrity and performance. The result is reliable work in high-risk environments, done right every time.

Why Our Quality Standards Matter

HEMI outperforms the industry on both quality and safety. Our weld reject and incident rates stay low and consistently beat industry benchmarks.

Weld Reject Rate
Welds requiring repair after inspection
Below1%
HEMIBelow 1%
Industry1–3%
Below the 1–3% industry average
EMR
Experience Modification Rate
0.79
HEMI0.79
Industry1.00
21% below the industry baseline
TRIR
Total Recordable Incident Rate
1.20
HEMI1.20
Industry2.2
45% below the construction average
DART
Days Away, Restricted or Transferred
0.60
HEMI0.60
Industry1.3
54% below the construction average

HEMI safety figures: 2025. Industry figures: U.S. Bureau of Labor Statistics, construction sector, 2024 (TRIR, DART); EMR industry baseline 1.00; TWI industry survey (weld repair rates).

Our Quality Control Process

  1. Pre-Job Planning

    We set the standards, build the inspection and test plans (ITPs), and lock in control points before anyone sets foot on site.

  2. Material Verification

    Every material is checked against the spec before it reaches the field. Nothing gets installed unless it's confirmed correct.

  3. In-Field Inspection

    Hold points are built into every phase. Work is reviewed and signed off before the next phase begins.

  4. Documentation & Handover

    At closeout you get a complete record: inspection reports, photos, and test results.

HEMI Systems Certifications

Work with HEMI Systems

Every project starts with a conversation. Tell us about your project, from scope and timeline to location and industry. Our team reviews every submission personally.

We respond to every inquiry within 48 hours, whether you need a single relocation or a full turnkey installation. No call centers, no automated replies. Just a direct line to the people who will actually do the work.